
The stretch most systems hand back to a spreadsheet: getting the units onto a lorry in the right order, onto the site in one piece, and into the openings with someone accountable for each one.
The installation control tower: progress, units done, site momentum, items by state, actions by type, the quantity funnel with its leakage, and an installer leaderboard.