WindoorERP
Hero
Load planning
Offline fitter app
Stage-by-stage evidence
Installation funnel
Numbers
Next
CTA
Make12 of 15 · Site team, project manager

Delivered is not finished — and the fitter’s phone works without signal.

The stretch most systems hand back to a spreadsheet: getting the units onto a lorry in the right order, onto the site in one piece, and into the openings with someone accountable for each one.

The installer’s job screen, with elevation drawings and per-opening progress
01Load planning

A load plan, not a packing list

  • Packages sorted in reverse route order so the last stop loads last
  • Stacking that respects level, cabin height and weight per stack
  • Position, row and level written per package, with no-fit and overweight flagged
  • Proof of delivery: signature, photo, GPS and the name of whoever received it
The load plan
The load plan
02Offline fitter app

The fitter’s phone works without signal

  • A portal login and an installable app, not an ERP seat
  • The last-loaded schedule and opening grids stay readable in a dead spot
  • Ticks and photos queue on the handset and replay in order when signal returns, with an honest count of what is still waiting
The installer’s job screen
The installer’s job screen
03Stage-by-stage evidence

Every opening, every stage, with a photo where you require one

  • Configurable stages — delivered, frame fixed, sealed, glazed, hardware, final check, handover
  • A stage that requires evidence cannot be closed without it
  • Piece rate per stage, if that is how your crews are paid
Installation actions, stage by stage
Installation actions, stage by stage
04Installation funnel

The funnel that shows where units are stuck

  • Sold, surveyed, produced, delivered, installed — and the gap between each pair
  • The stage holding the most work right now, named
  • Warranty starts itself the day the job is handed over
The installation control tower
The installation control tower
What this desk watches

The numbers on the wall

The installation control tower: progress, units done, site momentum, items by state, actions by type, the quantity funnel with its leakage, and an installer leaderboard.

Units installed against delivered
Snags open per work package
Stages waiting on a photo
What it produces
01A load plan
02A delivery note with proof of delivery
03An installation handover pack
04A warranty record per unit
45 minutes, your job

Bring one opening. We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

Book your demo Now!45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day