WindoorERP
Hero
Smart classification
Job cost link
Overview cards
Stock aging
Replenishment and forecast
Warehouses and locations
Stock at a date
Store requests
Serial-level costing
Off-cut register
Numbers
Next
CTA
Buy & plan06 of 17 · Store keeper, warehouse manager

Smart inventory: production material to production, installation material to the site.

In this inventory software for window manufacturers, every product knows what it is for: a profile, a pane of glass, fabrication hardware or installation hardware. So when an order is released, the store already knows what goes to the factory floor and what goes to the site, and the store keeper only has to pick it.

The inventory overview: a card for each kind of work in the store
01Smart classification

Production material to production, installation material to the site

SoloWorkshopFactory
  • Every product is classed once: profile, reinforcement, glass, fabrication hardware or installation hardware
  • Confirm a production order and profiles, glass and fabrication hardware go on the issue to production; installation hardware goes on its own transfer to the site
  • Glass ordered straight to the site stays off the factory transfer
  • Extra material requests follow the same split
  • From the phone, site crews see only the material meant for site
Products classed for fabrication or for installation
Products classed for fabrication or for installation
03Overview cards

A card for every kind of work in the store

SoloWorkshopFactory
  • Receipts, issue to production, finished goods in, installation material, deliveries and drop-ships, each on its own card
  • What is waiting, late or ready shown on the card; one click opens the list
  • Every new warehouse gets the same cards by itself
The inventory overview: a card per kind of work
The inventory overview: a card per kind of work
Open transfers grouped by kind of work
Open transfers grouped by kind of work
04Stock aging

What sits on the shelf, and for how long

SoloWorkshopFactory
  • Stock value per age band: 0-30, 31-60, 61-90, 91-180, 181-365 days and older
  • Average age, slow movers and turnover risk per product
  • By product, category, location or lot
  • Open the moves behind any line; print it or export it
The stock aging report: value per age band and turnover risk
The stock aging report: value per age band and turnover risk
05Replenishment and forecast

Smart replenishment from minimum, maximum and forecast

SoloWorkshopFactory
  • Reordering rules with a minimum and maximum, and a forecast that counts confirmed demand
  • A replenishment view that proposes what to buy: order, automate or snooze each line
  • Every bar length and colour of a profile is its own stock item
  • Material issued automatically when production starts
The replenishment view
The replenishment view
06Warehouses and locations

Several warehouses, and as many locations as you need

WorkshopFactory
  • Each warehouse with its own stock, operations and routes
  • Locations down to the bay and the shelf: glass A-frames, hardware shelves, line buffers, dispatch bays
  • Putaway rules send each arriving item to its place
  • Storage categories limit what goes where
  • Receipts and deliveries in one, two or three steps
Locations down to the bay: glass A-frames, hardware shelves, line buffers
Locations down to the bay: glass A-frames, hardware shelves, line buffers
Putaway rules routing each arriving item to a named bay
Putaway rules routing each arriving item to a named bay
07Stock at a date

Stock as it stood on any date

SoloWorkshopFactory
  • Stock and its value on any past date
  • Valuation with unit cost and total value per product
  • Moves history and moves analysis for the audit that follows
Stock valuation
Stock valuation
The dated move ledger the at-a-date figure is rewound from
The dated move ledger the at-a-date figure is rewound from
08Store requests

Material from the store, for the factory and the site

SoloWorkshopFactory
  • Site crews ask the store for material from their work package, or from the phone
  • The store issues it to the site with its own transfer
  • The store restocks through normal reordering
A foreman asking the store for material from a work package
A foreman asking the store for material from a work package
09Serial-level costing

Cost that follows the individual unit

WorkshopFactory
  • A serial per finished unit, linked back to the production order that made it
  • Material, labour and subcontract cost recorded against that serial
  • Finished windows enter stock with a proper receipt
Per-serial valuations
Per-serial valuations
10Off-cut register

A shelf of off-cuts the next job checks first

WorkshopFactory
  • Remainders above your reusable threshold recorded with their length and origin
  • Available, reserved, consumed or scrapped
  • The optimiser draws from that shelf before it opens a fresh bar
Glass remnants with their size, area and state, each traced to the order that produced it
Glass remnants with their size, area and state, each traced to the order that produced it
What this desk watches

The numbers on the wall

Stock, aging, location and movement reports, plus the overview cards.

Value on hand by age band
Off-cut length recovered
Cost variance per serial
What it produces
01A stock aging report
02A stock valuation at a chosen date
03A replenishment proposal
04A per-serial cost breakdown
45 minutes, your job

Bring one opening. We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

Book your demo Now!45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day