WindoorERP
Hero
Eight inspection stages
Blocking gates
Non-conformance dispositions
Site inspections
Numbers
Next
CTA
Make11 of 17 · QC inspector

A failed check stops the job, in the factory and on the scaffold.

A quality system that files a note is a filing system. This quality control software stops the next operation, and on site it stops the handover.

The site quality dossier, every check measured against its allowed tolerance
01Eight inspection stages

Eight stages, from the gate to the site

WorkshopFactory
  • Incoming material, after cutting, after welding, glazing, hardware, final, pre-dispatch and delivery
  • Yes/no, pass/fail, a measurement with tolerances, a pick list, or a required photo
  • Weighted scoring, with a reason code and a fail action per question
  • An empty checklist can never pass a gate
A quality checklist with weighted questions, tolerances and the action when a check fails
A quality checklist with weighted questions, tolerances and the action when a check fails
02Blocking gates

The gate is a gate

WorkshopFactory
  • A failed blocking check holds the item and raises a non-conformance
  • A held item’s operations refuse to become ready or to start
  • Pre-dispatch quality blocks loading; delivery quality blocks the transfer
Quality inspections by production stage, with score and result
Quality inspections by production stage, with score and result
03Non-conformance dispositions

Non-conformances that name who may decide

WorkshopFactory
  • Eight decisions, from rework and remake to scrap or accept as is: each starts the right job and needs the right person
  • Accepting a defect records a signed concession
  • Items on hold come back to the manager when the deadline passes
A non-conformance with its defect, root cause and disposition
A non-conformance with its defect, root cause and disposition
04Site inspections

On site, in the language the crew reads

SoloWorkshopFactory
  • Checklists written by the office without a developer
  • Question text and inspector guidance both translatable
  • Measurements with tolerance and the deviation recorded
  • A failure re-opens the earlier steps the crew must redo, and blocks handover until it is closed
  • Inspect from the installer's phone; readings outside tolerance flagged as you type
  • Send a site defect back to the factory; its decision orders the parts or the remake
  • Whole-job inspections with a score, by an inspector other than the crew if you wish
  • A critical failure alerts the manager at once
  • Accept a failed check only with a written reason, if you allow it
  • A dossier for the consultant: every check, reading, photo and fix
A site checklist with tolerances, severity and photo-required checks
A site checklist with tolerances, severity and photo-required checks
A site check on the phone, with a reading outside tolerance flagged
A site check on the phone, with a reading outside tolerance flagged
What this desk watches

The numbers on the wall

Quality and non-conformance analysis as a defect Pareto by root-cause stage and a severity-against-disposition pivot; site quality adds results, failures, first-pass rate, rework and measurements.

First-pass rate
Non-conformances by root-cause stage
Snags open against handovers due
What it produces
01A quality inspection record
02A non-conformance with its disposition
03A site quality dossier for handover
45 minutes, your job

Bring one opening. We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

Book your demo Now!45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day