WindoorERP
Hero
OEE breakdown
Operation costing
Skills and yield
Numbers
Next
CTA
Make10 of 17 · Production manager, finance

Every minute, every piece and every kilowatt is costed to the window that used it.

Labour and machine time are the costs nobody can see. Here, with OEE and job costing, they are measured where they happen and are costed to the window that used them.

The operator leaderboard: good units, first-pass yield and units per hour
01OEE breakdown

OEE you can explain to the person it describes

Factory
  • Availability is the share of logged time that was productive
  • Performance: how close each job ran to its standard time
  • Quality is good pieces over good plus scrap
  • Planned maintenance time shows up in machine availability, honestly
Work order analysis by work centre: planned against actual minutes, good and scrap units, labour cost
Work order analysis by work centre: planned against actual minutes, good and scrap units, labour cost
02Operation costing

Cost per operation, including the electricity

Factory
  • Labour cost is time at the work-centre rate plus piece rate
  • Energy cost is machine kilowatts times run hours times your tariff
  • Hours and piece rates exported for payroll after a manager signs off
  • What each window really cost to make: material, labour, outside work and electricity, ready to post to accounting
  • Factory labour also lands on the job's budget against actual
A machine's rated power and tariff, which price every operation
A machine's rated power and tariff, which price every operation
03Skills and yield

Who is qualified, and who is quick

Factory
  • A skills matrix per operator and work centre, with certification dates
  • First-pass yield and units per hour per operator, computed rather than entered
  • A daily ranking on the station screen; nobody shows as last before their first piece
Operator skills by person, with level, certification date and line
Operator skills by person, with level, certification date and line
What this desk watches

The numbers on the wall

The OEE radial and downtime Pareto on Production Control, plus labour and work-order analyses as pivots, and the operator scorecard list.

OEE and its three parts
First-pass yield per operator
Downtime by reason
What it produces
01A payroll export
02An OEE and quality summary
03A labour analysis
45 minutes, your job

Bring one opening. We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

Book your demo Now!45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day