
Two visits, and the second one exists because the first was made to win the job, not to cut it. What the technical office does between them is the difference between a frame that fits and a frame that comes back.
The Technical control tower: completion rate, open requests, surveys done against surveys booked, workload by person, and requests by type. Survey reporting adds surveyor performance and monthly statistics as pivots.