WindoorERP
Hero
Unit drawing
Costed take-off
Catalogue-driven design
Numbers
Next
CTA
Sell & design03 of 15 · Designer, estimator

One drawing. 194 costed components.

This is the part a general ERP has no opinion about: what a window is made of. Draw the unit and the system measures it — every bar, every pane, every bead, every hinge.

The drawing tool, with an opening laid out in 2D
01Unit drawing

Draw anything a customer asks for

  • Around forty frame shapes, from a square light to an arched composite
  • Sashes, mullions, transoms, fixed lights, fold and slide, with opening direction shown
  • Decorative grilles and glazing bars on the pane, not painted on afterwards
  • A 3D view of the same unit when a customer needs convincing
02Costed take-off

The drawing is a parts list

  • Frame, sash, mullion, bead, glass, steel liner, hardware and decoration, each its own costed group
  • 54.32 m of frame, 61.54 m of sash, 40.62 m of bead, 58.78 m of steel liner, 18.46 m² of glass and 29 hardware sets — from one door
  • Analysis versions kept, so a re-drawn unit does not erase what was quoted
  • A glass schedule that goes to the cutter as its own document
The glass schedule printed as its own document, a dimensioned sketch per pane
The glass schedule printed as its own document, a dimensioned sketch per pane
03Catalogue-driven design

Your catalogue, driving the drawing

  • Profile systems with their own cut rules and corrections
  • Glass build-ups, frame colours inside and out, hardware brands and series
  • Hardware chosen by rule — opening family, open mode, handing, whether it is a door
  • Seeded libraries for Roto, Siegenia, GU and MACO to start from
Hardware sets by series and application, each with the number of rules that pick it
Hardware sets by series and application, each with the number of rules that pick it
What this desk watches

The numbers on the wall

A form-and-list area rather than a dashboard one. The design analyses list is the working view: every version, its component count and its cost.

Components per unit
Cost per m² by profile system
Analyses re-run after a change
What it produces
01A drawing on the order line
02A costed take-off by component group
03A glass schedule
45 minutes, your job

Bring one opening. We will run it end to end.

A drawing, a profile system, or a quotation you have already sent. We load your catalogue into a live tenant and take it from the measured opening to a priced quotation, a costed material list, a nested cut list and a production record — with your hands on the mouse.

Book your demo Now!45–60 minutes · no slides · on a live database · English or Arabic · we reply within one business day