WindoorERP Documentation 19.0

Run pre-quote and production surveys through approval

11 min read Updated 2026-08-30 WindoorERP 19.0
This article is step 5 of 13 in 9- Setup the Technical Office and Site Surveys

What this does

WindoorERP keeps two kinds of site survey, on purpose. A Pre-Quote Survey (numbered PQS-YYYY-NNNN) is the first visit: the surveyor invents the item list on site, measures each opening, and the result prices the quotation. A Production Survey (PRS-YYYY-NNNN) comes after the order is won: its items are loaded from the confirmed sale order, each opening is re-measured against what was sold, and its approval is the gate that releases quantities toward manufacturing. Both hang off a technical request and live under Technical Tasks › Site Surveys › Surveys.

Before you start

  • A technical request exists — surveys are scheduled from its Survey & Measurements tab (or from the opportunity's Survey Status tab).
  • Your user has the Survey User access right; approving, rejecting and the survey Reporting and Configuration menus need Survey Manager.
  • For a production survey, the sale order is confirmed — its items are the survey's baseline.

From first visit to quotation

A completed pre-quote survey with the Create Quotation button, the status bar, the Items, Completion, Surveyed Area and Quotations tiles and the elevation preview tab

  1. 01
    On the technical request, press Schedule Pre-Quote (or let Run Step do it). A draft PQS survey opens with you as Surveyor; set the real surveyor and the Scheduled Start.
  2. 02
    On site, press Start Survey — or Mobile App for the touch capture screen. Add each opening with Add New Item: pick the Floor and Location, type width and height in millimetres, and the item code is minted automatically from the floor code (floor 1, item 5 → 105).
  3. 03
    Mark each finished item Done, then press Complete Survey. Within the approval threshold the survey lands in Completed; beyond it, in Pending Approval for a manager's Approve or Reject.
  4. 04
    Press Create Quotation, choose the Profile and Outside Color (plus inside colour, glass, accessories as needed) and confirm — one quotation line per surveyed item, with the survey PDF attached to both records.
  5. 05
    Once the order is won, Schedule Production Survey: the items arrive pre-filled from the order. Re-measure, complete, and have the manager Approve — approval writes the measured quantities back to the order and unlocks Create Production Order.

The Surveys menus

MenuContents
All SurveysBoth types together, cancelled ones filtered out. Opening a row always lands in the correct type-specific form.
Pre-Quote Surveys / Production SurveysOne type each, as list, kanban (cards grouped by state, with photo or design cover, progress bar and area badges), form and calendar.
Pending ApprovalEverything waiting for a decision. Survey managers only — the menu is hidden from other users.
Survey CalendarBoth types on a month calendar by Scheduled Start, colored by type — the dispatch board for the measuring crew.

The Pending Approval list showing a production survey with its technical request, customer, surveyor, scheduled start and the Pending Approval badge

The survey life cycle

Six states: DraftIn ProgressCompletedPending ApprovalApproved, with Cancelled to the side. The header buttons enforce it strictly:

ButtonRule
Start SurveyDraft only ("Survey can only be started from Draft state."). A production survey also refuses to start with no items: "Cannot start a Production Survey without any survey items. Please add items first or copy from a Pre-Quote survey." Starting records the actual start time and, from the mobile portal, the GPS position.
Complete SurveyIn Progress only. Records the end time, then routes to Pending Approval when approval is required, else Completed. Going to approval schedules a to-do — "Survey Approval Required", with the area difference — for every survey manager.
Approve / RejectPending Approval only, survey managers only. Reject returns the survey to Draft for corrections and closes the approval to-dos.
CancelAny state except Approved ("Cannot cancel an approved survey.").
Reset to DraftCancelled only.

When is approval required?

Two rules, both from Site Surveys › Configuration › Settings: every production survey requires approval while Require Production Approval is on (the shipped default), and any survey requires approval when its total surveyed area differs from the quoted area by more than the Approval Threshold (%) (default 5).

What approving a production survey does

Approval is not a formality. For each completed line linked to an order line it adds the Measured Qty to the order line's surveyed quantity, and writes the surveyed floor, location and sill height back onto it. The write-back runs exactly once per survey — a survey that has already posted its quantities will not post them again, even if the workflow is replayed. If the journey stage mapping is configured, approval also moves the technical request forward to the mapped stage. This is why re-opening approved surveys is not offered: corrections go through a new revision survey instead.

Reading the survey form

Both forms share the same skeleton: a guidance strip that always names the next sensible action ("Add the first survey item", "Continue measuring 3 of 5", "Waiting for approval"…), the Survey Details and Assignment groups (request, opportunity, customer and order are read-only links; Surveyor, Scheduled Start/End are yours to set), a Time Tracking group filled by Start/Complete, and a row of live tiles — items done, completion %, surveyed area, plus quotations (pre-quote) or quoted area, area difference and not-ready count (production). The tabs:

TabContents
ElevationEvery item drawn to scale, grouped by floor — blue pending, green measured, amber site-not-ready. The same drawing appears on the PDF report.
Survey LinesThe measuring table (below).
Mobile ViewOn phones, cards per item with an Edit button into the touch capture app.
Customer ContactThe on-site representative and phone, and the customer and surveyor signature pads.
NotesGeneral notes and site-access instructions.
LocationThe GPS start and end positions captured by Start/Complete, read-only.
Customer LocationThe same map-and-QR geolocation suite as the technical request, sourcing coordinates from the opportunity first, then the customer.

Header utilities on both types: Print PDF, Export Excel, Export CSV, Email Report (a dialog pre-addressed to the customer, with an optional Excel attachment), plus a Duplicate smart button that copies the survey back to Draft without times, signatures or approvals.

Measuring: the survey lines

A pre-quote line is deliberately lean: code, description, floor, location, Width and Height (mm), quantity, computed area, a Done toggle and the result badge. A production line adds the ordered reference — Quoted W/H and Quoted Qty — next to the measured values, a computed Diff %, the Not Ready toggle, and a scissors button to split multi-unit items.

Opening a line (the external-link button) reaches the full item form: three aperture width and three height measurements — the surveyed dimension is set to the minimum of what you enter — two diagonals, sill height, tangent points, the site-condition dropdowns (window position, drainage face, the four aperture finishes, opening section, threshold, scaffolding), the exhaust cut-out block, the fittings and finishes boxes, two photos, a voice note, freehand and CAD sketches, remarks, and the measurement provenance (typed, laser, or inherited from the quote, with device and timestamp).

Rules the lines enforce:

RuleDetail
Result badgePending until Done; then Pass when the area difference is within ±5%, Fail beyond it, Site Not Ready when flagged. The ±5% of the badge is fixed; the configurable threshold governs approval, not the badge.
Site Not ReadyFlagging an item marks it Done and demands evidence — completing it without a photo raises "Please upload a photo showing the site condition.", without a reason "Please provide a reason why the site is not ready.". The form shows a warning ribbon and a not-ready tile while any line is flagged.
Split ItemSplits a quantity line into individually measured openings named code-1, code-2… Up to 7 units it splits immediately, keeping one on the main line; above 7 a dialog asks how many to split off. Only in Draft or In Progress, and never for quantity 1.
Quantity warningMeasuring more than was ordered pops "Surveyed quantity (…) exceeds quoted quantity (…). Please verify this is correct." — a warning, not a block.

Production extras

An approved production survey with the Create Production Order button, the Profile and Glass group, the quoted versus surveyed area tiles and the Compare to Order smart button

The production form carries the manufacturing hand-off. Copy from Pre-Quote (Draft, no items yet) pulls the pre-quote's measurements and site conditions as a starting point — never its photos or done flags. A read-only Profile and Glass group shows the order's profile, colours, glass and accessories. Each line shows the Production Design thumbnail and, for design-capable products, buttons to Create/Edit the production design in the designer and to view its Design Analysis. Compare to Order opens a read-only side-by-side of every item — ordered width, height, area and sill against surveyed — with totals and difference percentages.

Once the survey is Completed or Approved, Create Production Order builds a production order from the completed items: measured quantities, the item's production design and analysis (falling back to the sale-order line's design when the survey line has none — each fallback is noted in the production order's log). Items that are completed but did not Pass are still copied, with a chatter warning naming them so they can be removed by hand. A Production smart button counts the linked orders afterwards.

Acting in bulk

The Actions menu on the survey lists offers Bulk Assign Surveyor (draft surveys — set the surveyor and optionally a new date at once), Bulk Approve / Bulk Reject and their type-specific variants (Bulk Approve Pre-Quote, Bulk Approve Production…). The bulk production approval performs the same quantity write-back as the form button, per survey; bulk reject demands a rejection reason and posts it on every survey. Selections in the wrong state are refused — "Please select at least one survey in Draft state." / "…in Pending Approval state."

Troubleshooting

"Cannot start a Production Survey without any survey items." — the linked order has nothing left to survey (all quantities delivered) or the survey was created without an order; add items, or use Copy from Pre-Quote.

"Survey already has items. Please delete the existing items before copying." — Copy from Pre-Quote only fills an empty survey.

"No completed pre-quote survey found for this task." — the pre-quote is still in Draft or was cancelled; it must have been started to be a source.

"The survey must be Completed or Approved before creating a quotation." — finish the survey first; the Create Quotation button follows the same rule.

"No product found for: … configure the Color & Material mapping…" — the quotation wizard found no product for the chosen profile and colour on those items; complete the Color & Material mapping or set each line's product by hand in the wizard.

"No production survey found for comparison. Please create and complete it first." — Compare to Order was pressed from a pre-quote whose order has no started production survey yet.

An approved survey needs correcting — approved surveys are closed on purpose (their quantities are posted). Have the surveyor raise a re-visit request from the portal, or duplicate the survey; the duplicate starts in Draft with quantities unposted.

The survey went to Completed although you expected an approval step — the area difference is within the threshold and it is not a production survey with Require Production Approval on; check the Settings.

Common mistakes

  • Cutting from pre-quote figures — only an approved production survey posts verified quantities toward manufacturing.
  • Leaving Fail items unexamined before approving — approval posts their measured quantities like any other line.
  • Skipping the three-point aperture measurements on awkward openings — the minimum rule exists to keep the frame inside the real, out-of-square masonry.
  • Measuring five identical windows on one line when they differ — split the item and measure each opening.

Was this article helpful?

Running a window or door factory?

Ask for a demo