WindoorERP Documentation 19.0

Shape the task workflow: stages, work status and roles

3 min read Updated 2026-08-29 WindoorERP 19.0
This article is step 3 of 13 in 9- Setup the Technical Office and Site Surveys

What this does

The task workflow of a WindoorERP project has two layers. The stage — the kanban column — is shared by the team and configurable; the Work Status flag stamped by the header buttons is a fixed four-step ladder. This article covers what each is for, where the stage lists are maintained, and what roles and tags add. It documents what ships: automated activity plans and project-level stages are not part of this build's menus.

Before you start

  • Fleet-wide stage editing lives under Installation › Configuration › Task Stages — that screen lists every task stage in the database, technical projects' included.
  • Renaming a stage there renames it for every project that shares it.

Set up the workflow

  1. 01
    Leave the seeded ladder alone unless you truly need another shape — every typed project starts with NewIn ProgressQADone and a folded Cancelled, so all boards read the same.
  2. 02
    To add a column for one project only, use the board itself: open the project's tasks and add a stage at the end of the columns.
  3. 03
    To change the shared ladder, open Installation › Configuration › Task Stages: name, sequence and the Folded in Kanban flag per stage.
  4. 04
    Keep terminal stages folded — folding is what marks a task closed for the project's completion percentage.
  5. 05
    Maintain Project Tags in the same Configuration menu for cross-project labels (villa, tower, government…).

Stage versus Work Status

LayerNatureWho changes it
StageConfigurable columns, owned by the project; folded stages count as closed.Anyone working the board — drag the card or click the stage bar.
Work StatusFixed flag: Draft, In Progress, QA, Done. Tracked in the chatter.The four header buttons on the task. They set the flag only — the card does not move by itself.
Personal StageA private column per user, invisible to others.Each assignee, for their own ordering.

Because the two shared layers move independently, agree with the team which one is authoritative for "done" — most teams pick the stage, and use Work Status as an audit stamp of who declared what, when.

Roles

Tasks carry a Roles field — labels such as who surveys, who checks, who installs on this task. Roles are assignment vocabulary, not permissions: they grant nothing and hide nothing. Use them when one task involves several people in different capacities and the assignee list alone loses that information.

Troubleshooting

A stage renamed for one project changed everywhere — the stage record was shared; give the project its own stage from its board instead of renaming the common one.

The completion percentage ignores finished tasks — their stage is not folded; fold the terminal stage.

You are looking for Project Stages, Activity Plans or a Project configuration menu from standard Odoo — they are not part of WindoorERP's menu set; the task-stage screen above and the per-project Settings tab are the supported configuration surfaces.

Common mistakes

  • Deleting a stage that still holds tasks instead of folding or renaming it.
  • Building a different stage ladder per project without need — identical boards are what make cross-project supervision readable.

Was this article helpful?

Running a window or door factory?

Ask for a demo