Analyze Site QC first-pass yields, failure modes, rework costs, and tolerance measurements
What this does
Delivers in-depth analytics on site installation quality trends, evaluating First-Pass Yields (FPY), common failure categories (Sealant Void, Scratched Frame, Sash Sag), and rework labour costs.
Before you start
- Site QC inspections logged across active installation projects.
Steps















Important
Maintaining a First-Pass Yield (FPY) above 95% on site inspections ensures that installation crews meet handover targets without costly second-visit return trips.
-
01
Open Installation › Analysis & Reports.
-
02
Explore Site QC Results, Site QC Failures, and Site QC First Pass Rate.
-
03
Examine Site QC Measurements to evaluate laser tolerance deviations across window profiles.
-
04
Inspect Site QC Rework analytics to measure the financial cost of site technician rework hours.
Common mistakes
- Treating site rework hours as regular project hours without tagging them to the original defect root cause.
- Ignoring recurring sealant adhesion failures caused by low ambient temperatures.
Was this article helpful?
Thanks — your feedback helps.
Running a window or door factory?
Ask for a demo