Schedule manufacturing batches and balance machine capacity with Factory Planner
What this does
Visualizes machine queue allocations and assembly timelines, enabling factory managers to drag-and-drop batches according to installation site readiness.
Before you start
- Manufacturing orders must be confirmed with estimated cycle times per opening.
Steps

Important
Balance cutting batches by aluminium profile series to minimize saw blade adjustments and profile changeover downtime.
-
01
Navigate to Production › Overview › Factory Planner.
-
02
Review the timeline grid displaying scheduled orders across double-head saws, CNC routers, and assembly lines.
-
03
Drag order batches horizontally to adjust target start and completion shifts.
-
04
Inspect capacity load bars above each machine to prevent work center overloading.
Common mistakes
- Scheduling high-volume commercial curtain walls during periods of planned CNC saw calibration.
- Moving order deadlines forward without checking glass unit lamination curing times.