Schedule manufacturing batches and balance machine capacity with Factory Planner

1 min read Updated 2026-08-28 WindoorERP 19.0

What this does

Visualizes machine queue allocations and assembly timelines, enabling factory managers to drag-and-drop batches according to installation site readiness.

Before you start

  • Manufacturing orders must be confirmed with estimated cycle times per opening.

Steps

Visual factory planner timeline for scheduling machine and assembly queues

Important

Balance cutting batches by aluminium profile series to minimize saw blade adjustments and profile changeover downtime.

  1. 01
    Navigate to Production › Overview › Factory Planner.
  2. 02
    Review the timeline grid displaying scheduled orders across double-head saws, CNC routers, and assembly lines.
  3. 03
    Drag order batches horizontally to adjust target start and completion shifts.
  4. 04
    Inspect capacity load bars above each machine to prevent work center overloading.

Common mistakes

  • Scheduling high-volume commercial curtain walls during periods of planned CNC saw calibration.
  • Moving order deadlines forward without checking glass unit lamination curing times.