WindoorERP Documentation 19.0

Print elevation diagrams, profile cutting optimizations, glass cutting lists, and work order travelers

2 min read Updated 2026-08-28 WindoorERP 19.0

What this does

Generates professional production job packages containing 1:1 parametric elevation drawings, barcode traveler route sheets, profile/glass cutting optimization plans, and CE Declarations of Performance.

Before you start

  • Production order confirmed and cut-optimization calculated.

Steps

Parametric elevation diagram printable submittal with dimensions and profile cross sections

Profile cutting optimization printable plan displaying bar layout and scrap reduction

Glass cutting list printable report showing width, height, and double-glazing air spacer specs

Extruded profiles bill of quantities printable breakdown

Hardware and accessories bill of quantities printable list

Work order traveler route sheet with routing barcodes

CE Declaration of Performance certificate for manufactured window units

OEE and manufacturing quality audit summary report

Comprehensive production itemized fabrication dossier

Raw material scrap and wastage analytical report

Reinforcement iron cutting optimization layout

Glass cutting structural engineering design analysis detail report

Important

Including barcoded Work Order Travelers at each workstation guarantees that CNC milling and corner crimping follow the exact CAD fabrication specs.

  1. 01
    Open any confirmed Production Order or Work Order.
  2. 02
    Click Print and select Elevation Diagram to generate high-resolution dimensional drawing submittals.
  3. 03
    Print Profile Cutting Optimization and Glass Cutting List for factory saws.
  4. 04
    Generate Work Order Traveler with routing barcodes for shopfloor stage tracking.
  5. 05
    Print Declaration of Performance and OEE & Quality Summary for final client handover dossiers.

Common mistakes

  • Sending manual saw operators profile cutting lists without the multi-bar optimization cutting diagram.
  • Handing over completed structural glass facades without the official signed Declaration of Performance.

Was this article helpful?

Running a window or door factory?

Ask for a demo