Set the quality gates
Decide who may authorise rework and scrap
Why this step
Scrapping an assembled frame destroys material, labour and a delivery date at once. An approval matrix makes that a decision with a name attached, at the level the loss justifies.
What this does
Enforces governance over high-value scrap disposals, architectural deviation approvals, and design change requests across factory management.
Before you start
- Approval matrices configured with role hierarchies (Floor Supervisor, Production Manager, Plant Director).
Steps



Important
Scrap authorizations exceeding financial thresholds (e.g. > 5,000 SAR) require dual sign-off from both Production Management and Cost Accounting.
-
01
Open Production › Approvals › Approval Requests to view pending authorizations.
-
02
Inspect the technical justification, scrap financial cost impact, and engineering documentation.
-
03
Authorized managers click Approve or Refuse with mandatory explanatory notes.
-
04
Configure approval rules under Production › Configuration › Approval Matrices.
Common mistakes
- Scrapping expensive thermal-break profiles before obtaining formal digital approval in the system.
- Approving dimension deviations without confirming architectural consultant sign-off.
Checkpoint
Scrapping or reworking above your threshold waits for the approval you configured.