WindoorERP Documentation 19.0

When the day goes wrong

The gate is locked, or the opening is not built yet

Why this step

These are outcomes, not failures, and the system has a place for both. Report what stopped you, with a photo — a locked gate, unfinished blockwork — and the office is told at once so they can chase the contractor or re-plan the visit. A wasted trip that is recorded is worth something; one that is only complained about in the van is not.

Checkpoint

The office has an action against the job, and your photo is on it.