Closing the job
Run the check before you leave the site
Why this step
Press Submit to office and the checks run first, listing everything at once: openings neither measured nor marked unready, not-ready items with no reason or no photo, anything that disagrees with the same opening on other floors. Every one of these costs a minute to fix while you are standing there and a return trip to fix afterwards. That is the entire point of running them here.
Checkpoint
The check comes back clean, or you have fixed what it found without leaving.