9- Setup the Technical Office and Site Surveys

The department between the salesperson and the saw: laser surveys, drafting queues, structural calculations and CAD submittals — set up as a department, not as a folder of drawings.

13 steps about 18 min Advanced Technical office manager or chief draughtsman

Journey complete

You have worked through every step. Keep the momentum — the next journey builds on what you just did.

All journeys

Most ERPs stop at sales and manufacturing and assume a drawing appears in between. A fenestration contract does not work that way: somebody has to measure a building that is still being built, decide what a tolerance allows, produce shop drawings a consultant will stamp, and only then release the factory. WindoorERP gives that work its own department, and this path sets it up.

Two things here have no equivalent elsewhere and are worth the most attention: the survey master options, which decide whether two surveyors describe the same opening the same way, and the split between the pre-quote survey and the production survey — the second is what releases material to the saw, so it carries an approval the first does not.

By the end you will be able to

  • Create the technical office as a real department: drafting teams, request types, stages and their own tags
  • Fix the surveyor's vocabulary — finishes, fittings, floor levels, site conditions — so two surveyors describe the same opening the same way
  • Run the two surveys a fenestration contract needs: the pre-quote survey and the production survey that releases the factory
  • Put surveyors on the mobile field portal, logging laser measurements and site photos from the scaffolding
  • Handle what comes back from site: observations, customer messages and re-visit requests
  • Queue, assign and track CAD drawing requests instead of forwarding drawings by email
  • Carry structural calculations and consultant submittals against the project they belong to
  • See the drafting backlog, the weekly delivery commitments and who is overloaded, before a submittal is late

Before you start

  • Administrator rights, and the Technical Tasks and Project modules installed
  • Your profile series and designs in place — "4- Setup Your Product Catalogue and Designs"
  • Surveyors and draughtsmen as users, with phones or tablets they will carry on site
  • A decision, before you start, on what your technical office actually produces: shop drawings, structural calculations, consultant submittals, or all three